real estate development

Feasibility Studies

Post-Katrina site evaluation

Post-Katrina site evaluation

Post Katrina, CCI provided numerous clients with rapid turnaround assessments of numerous parcels to be evaluated for construction of critical housing. This included analysis of aerial photography, initial wetlands reviews, targeted Phase I site assessments, and on-site reconnaissance. This work was done as per FEMA requirements for environmental clearance.

Site Design and Construction Oversight

CCI provided complete site design and construction oversight services for two multi-family developments which included over 600 units in Slidell and Baton Rouge, LA. The work included Phase I Environmental Site         Assessments, preliminary plat development, wetland delineations and permitting, wastewater pump station design, site engineering design, and construction stakeout.

 For a 61-lot subdivision, CCI provided complete site development services including preliminary plan development; construction plans,    wetland permitting and mitigation, water quality certification, storm water pollution prevention plan design and implementation, drainage impact study, and wastewater treatment plant design and operation.

 For a local architectural firm, CCI provided specialty services in the following areas for eight separate projects: paving joint plan, geometric plan, retaining wall design, preliminary site plan, grading & drainage plan, utility plan, traffic impact study, and topographic surveys. Construction stakeout was supplied on several of the projects.